Tuesday, May 29, 2007
Site Visit Summary
While studying this unit i have attended five construction sites. Two of them have been at Laverton in Melbourne with a company called Australand. I met with a construction manager on these sites and he took me on a tour of them. One of the jobs was just at the frameing up stage of construction of a portal frame. It was interesting seeing the cranes at work. I also visited a site where they had finished the frame and were constructing the office at the front. This gave me a good view of precast concrete pannels etc. I was lucky enough to get two full sets of drawings that matched these two sites. The project manager went through these drawings and really helped me gain a good understanding of the construction process. I was also able to visit a site at the airport with the same company. This time they were very busy as they were prepareing for the infill slab inside the warehouse etc so i was only there briefly. It was good to see the action at these sites as i was able to see pritty much the whole on site construction process between the three. I also went to ATEX steel in Moolap Geelong who are a private steel fabricateing firm. Here i was able to the the process they go through to weld the end plates and cleats onto beams. They were not so keen on me taking photos but did give me very detailed explanations of there work and a few working drawings These were very hard to scan up as they were in A3 size. I also attended a very small site in Ballarat which was the same sort of construction just on a small scale. I jumped the fence for this one so didnt really get to go over the site for all that long. Following are some of the photos i got at all of the site visits.
Friday, April 13, 2007
Wednesday, March 14, 2007
Tuesday, March 6, 2007
Bunnings Warehouse
Subscribe to:
Posts (Atom)